×

Select global Site Language
Deutschland & Global Deutsch | English | Español | Français
UK English
USA English
中华人民共和国China 中國 | English
South Africa English
France Français
India English
América Latina Español
Middle East English
Produits notés
Contact
Vous avez des questions ? Volontiers !
Toiles tissées techniques:
solidweave@gkd.de

Toiles tissées pour bandes de process:
weaveinmotion@gkd.de

Mailles pour l'architecture:
creativeweave@gkd.de

Ou bien utilisez notre:
formulaire de contact

Presse

Game, set and match

Madrid's new multifunctional tennis centre

The former idyll on the banks of the Manzanares – the narrow river that traverses Madrid and was, in centuries gone by, the traditional place to head for on light-hearted outings – gave way in the 60s to the M30 inner-city ring road with its daily traffic volume of over 300,000 vehicles. Apart from the noise and pollution it caused, the fact that this motorway also effectively separated old from new Madrid was reason enough for city planners to begin with an ambitious infrastructural programme. In just four years, from 2004 to 2007, the city ring road with all its through traffic was relocated to an underground tunnel system, the Madrid Calle 30. As a result, the city centre and the suburbs are no longer separated from each other and Madrid has been given room for a new “green lung”. The distinctive landmark of the Parque del Manzanares is Dominique Perrault’s Centro Deportivo Multifuncional del Manzanares, built to bolster Spain’s application to host the 2016 Summer Olympics.

Autres sujets

×

Veuillez vous connecter pour voir des contenus supplémentaires

Si vous n'avez pas encore d'accès au GKD-InfoCenter, veuillez ouvrir un compte utilisateur. En raison du nouveau site Internet, nous prions les clients ayant déjà un compte de se réinscrire ici.

S'inscrire
Vous avez oublié votre mot de passe ?